Week 4
-Finish working circuit with hack remote (make robust to work with soft switch)
-Get working prototype with microcontroller, set up meeting with pcb designer
-Buy first round of fabrics with Rebecca
-Get working prototype with microcontroller, set up meeting with pcb designer
-Buy first round of fabrics with Rebecca
Week of 2/12/2008 - 2/18/2008
Week 5
-Meet with Rosie to document schematic/eagle file of arduino circuit to make pcb
-Meet with Leif to discuss leadtime of pcb ordering
-Make thorough questionaire for user testing for riders on Mt. Schweitzer
-Finish working hack remote with real glove to test in Idaho
-Meet with Leif to discuss leadtime of pcb ordering
-Make thorough questionaire for user testing for riders on Mt. Schweitzer
-Finish working hack remote with real glove to test in Idaho
Week of 2/19/2008 - 2/25/2008
Week 6
-Begin draping dressform
-Begin midterm presenations/outline
-Begin second prototype with remote hack based on research results (try belt/jacket version)
-Start website/Start research paper
-Begin midterm presenations/outline
-Begin second prototype with remote hack based on research results (try belt/jacket version)
-Start website/Start research paper
Week of 2/26/2008 - 3/03/2008
Week 7
-Work on website more/Begin market research
-Sewing, sewing, sewing (work at parsons to begin muslin for suit)
-User research, second draft based on first trial's results
-Continuous circuit testing
-Sewing, sewing, sewing (work at parsons to begin muslin for suit)
-User research, second draft based on first trial's results
-Continuous circuit testing
Week of 03/04/2008 - 3/10/2008
Week 8
-Begin muslin, test with soft circuit (both wrap wire and conductive fabric)
-Solder/Test/Program pcb *(should be back by this point}
-Continue work on modification garments
-Website work
-Create outline for paper
-Solder/Test/Program pcb *(should be back by this point}
-Continue work on modification garments
-Website work
-Create outline for paper
Week of 03/11/2008 - 3/17/2008
Week 9
-Finish muslin
-Continue modification garments
-User testing on first version of modification garments
-Finish website
-Begin formal paper
-Continue modification garments
-User testing on first version of modification garments
-Finish website
-Begin formal paper
Week of 03/18/2008 - 3/24/2008 (SPRING BREAK/OUT OF COUNTRY)
Week 10
-Finish muslin/Begin custom garments with PBC
-Continue modification garments
-User testing on first version of modification garments
-Continue paper/begin formal documentation
-Continue modification garments
-User testing on first version of modification garments
-Continue paper/begin formal documentation
Week of 03/25/2008 - 3/31/2008
Week 11
-Continue/Finish modification garments
-Continue custom garments -User testing on first version of modification garments
-Finish Website -Continue paper/begin formal documentation
-Continue custom garments -User testing on first version of modification garments
-Finish Website -Continue paper/begin formal documentation
Week of 4/01/2008 - 4/07/2008
Week 12
-Finishing touches on all garments
-Catch up week. Safety week for complications
-Continue paper, begin outline for presentation of thesis
-Catch up week. Safety week for complications
-Continue paper, begin outline for presentation of thesis